Sourcing accommodation for a team of four is straightforward. Sourcing it for forty is a different problem entirely — and it’s one that most procurement teams don’t fully anticipate until they’re mid-project and dealing with the fallout.

This guide is for the people managing that problem: project directors, commercial managers, and logistics coordinators on large construction and infrastructure contracts where the team is too big for a hotel block and too spread out for individual bookings to make sense.

Why hotel blocks stop working at scale

For a team of three or four, individual hotel bookings are fine. They’re flexible, easy to expense, and broadly available anywhere in the UK.

For a team of forty, the problems compound quickly.

Cost. Even at a budget rate of around £60 per person per night, hotel accommodation for forty people comes to more than £430,000 over a six-month contract, and mid-range hotels push that much higher. Whole-property accommodation at the same scale runs at a fraction of that: on a long stay with the house fully occupied, it can be as little as a third of the per-head cost.

Logistics. Forty individual hotel bookings means forty separate check-ins, forty sets of key cards, forty separate expense claims, and forty separate conversations with a front desk every time a phase shifts or an extension is needed. At project pace, that admin load is genuinely damaging.

Suitability. Hotel rooms are designed for transient stays of one to three nights. For a team working 10-hour site days across a six-month contract, the inability to cook a proper meal, wash work clothes in-house, or have somewhere to decompress that doesn’t feel like a budget airport layover is a real operational and wellbeing issue.

What the right model looks like for a 40-person team

The approach that works for large contractor teams is whole-property portfolio booking: multiple houses or apartments, each accommodating a sub-group of the team, all booked through a single operator, on a single invoice, with a single point of contact managing everything.

The key features that make this work in practice:

Portfolio flexibility. A well-run contractor accommodation operator in a major project area should be able to accommodate 20–40 people across multiple properties within a short distance of the site. Teams can be split by trade, phase, or preference — but the operational management stays in one place.

One invoice. For a 40-person team across six months, corporate procurement needs a single monthly invoice payable to the company, not a collection of individual receipts. This sounds obvious, but many accommodation providers — holiday let operators, serviced apartment platforms, B&B chains — aren’t set up for it. Find an operator who issues clear company invoices (with VAT where applicable) before you commit.

Flexibility on dates. Construction projects run over. Phases extend. Scope changes. You need an accommodation partner who understands how projects actually work — not one who charges a 20% penalty every time the checkout date moves.

All-bills-included. For a 40-person team, you do not want to be settling individual utility bills at the end of a contract. Everything — electricity, gas, water, WiFi, council tax — should be included in the quoted rate. If it isn’t, press for it. Most operators running genuinely contractor-ready properties will accommodate this.

Cost comparison at scale

For a 40-person team in Bedford on a six-month contract:

OptionRate6-month total (180 nights, approx.)
Budget hotel per person£60/night£432,000
Whole-property portfolio (40 beds)from £20/person/night£144,000
Saving~£288,000

Figures exclude VAT and are illustrative: 40 people × 180 nights, using our long-stay rate for a fully occupied house. Over 12 months the same gap grows to roughly £584,000.

On a major contract, that’s a number worth managing carefully.

When to start looking

The single biggest mistake large contractor teams make on accommodation is leaving it too late. In a market under active demand pressure — which Bedford currently is, with Universal United Kingdom Resort construction, East West Rail works, and Luton Airport expansion all running concurrently — the good properties fill first and stay filled.

If you have reasonable visibility on a project in the Bedford area in the next 6–18 months, the time to have the accommodation conversation is now, before you have a signed contract. Most professional SA operators will hold availability for serious enquiries and provide indicative rates without any commitment required.

PVTL Stays — multi-property contractor accommodation in Bedford

We run 40 beds across four contractor-ready properties in Bedford, with a client base that’s 90%+ corporate. We work with companies on large-scale, long-duration contracts — average stay across our portfolio is 30+ nights.

We’re set up for what procurement actually needs: single invoice, flexible dates, all-bills-included rates, clear company invoicing, and a single point of contact for all four properties.

If you’re planning a project in Bedford and need to house a team, we’d rather have the conversation now than be full when you need us.